Cook County Feasibility Study
Cook County, home to Chicago and a wide range of suburban and unincorporated areas, offers countless opportunities for new construction and redevelopment. From single-family infill projects to large-scale commercial ventures, developers are drawn to its strong market and strategic location. However, before moving forward with design fees and engineering costs, it’s crucial to use your feasibility period to fully understand what is—and isn’t—possible on your site.
Your feasibility window allows you to identify zoning restrictions, code requirements, and potential hidden costs before making substantial financial commitments.
Research Zoning and Local Land Use Rules
In Cook County’s unincorporated areas, the Department of Building and Zoning oversees development standards. Determining your property’s zoning district is a critical first step. Zoning regulations govern:
Permitted uses, such as single-family, multi-family, retail, office, or industrial
Minimum lot sizes and frontage requirements
Floor area ratios, building height limits, and maximum lot coverage
Required setbacks from property lines and public streets
Some parcels may also be affected by overlay districts or special flood hazard designations. Verifying these details early helps confirm whether your proposed use is allowed outright or whether you’ll need a variance or special use permit.
Develop a Strong Preliminary Site Plan
During feasibility, creating a well-organized conceptual site plan is vital for uncovering potential challenges. In Cook County, a preliminary site plan typically includes:
Accurate property lines and any existing easements
Proposed building footprints and access points
Driveway layouts, parking lots, and pedestrian pathways
Stormwater drainage features and topographic considerations
Utility connection points for water, sewer, and electrical service
Planned landscaping, buffer zones, and green space preservation
A detailed conceptual layout helps clarify how much usable space you truly have and whether the site can accommodate required circulation, parking, and setbacks.
Estimate Permit Fees and Review Timelines
In Cook County, permit fees depend on factors such as building type, use, and total project valuation. During feasibility, you should estimate:
Building permit fees for new construction or major alterations
Additional costs for electrical, plumbing, and mechanical permits
Site development and grading permit charges
Possible fees for inspections or special approvals
Average review times can also vary significantly depending on project complexity and whether your project involves public hearings or additional environmental review. Planning for these timelines now helps avoid delays later.
Consider a Pre-Submittal Meeting for Early Feedback
Cook County offers pre-submittal meetings to help applicants understand code requirements and submission expectations before investing in full design plans. At this meeting, you can receive:
Clarifications on zoning compliance and required variances
Insights into potential challenges with drainage or utilities
Advice on supporting technical studies or reports that may be required
An overall sense of whether your project is likely to be approved as proposed
Taking advantage of this option helps avoid costly design revisions later in the process.
Identify Additional Technical Studies and Special Reviews
Certain projects may trigger the need for additional analyses or external approvals. Examples include:
Stormwater management reports to comply with local and regional drainage standards
Soil and geotechnical studies for structural safety and foundation design
Traffic impact assessments for commercial or multi-unit residential developments
Floodplain development permits for parcels within special hazard zones
Environmental impact assessments for larger or sensitive sites
Incorporating these requirements into your feasibility review helps ensure your budget and schedule remain realistic.
Understand Inspections and Final Approval Steps
While still in the feasibility stage, mapping out Cook County’s inspection and final approval process can help you prepare for the construction phase. Typical inspections include:
Pre-pour foundation and footing checks
Structural framing and fire safety inspections
Mechanical, electrical, and plumbing rough-in reviews
Site grading and final landscaping inspections
Certificate of Occupancy inspection before final use or tenant occupancy
Knowing these steps early lets you set realistic construction milestones and anticipate potential delays.
Cook County Feasibility Period Checklist
Research zoning district regulations and overlay restrictions
Prepare a conceptual site plan tailored to local requirements
Estimate permit fees and potential plan review timeframes
Schedule a pre-submittal meeting for preliminary feedback
Identify required technical studies and agency clearances
Understand inspection steps and final sign-off requirements
Ready to Move Forward with Your Cook County Project?
If you’re in your feasibility period and want to confidently determine your site’s potential before committing to design costs, we can help. Our team specializes in creating detailed preliminary site plans and providing thorough feasibility assessments that follow Cook County’s development standards. With clear, up-front guidance, you can make smart go/no-go decisions and move ahead with confidence.